Total manufacturing cost divided by production volume
Total manufacturing cost divided by production volume
The cost is calculated after production is complete and all inputs are consumed. It confirms past performance, typically 15-30 days after the operational decisions that drove the cost were made.
Total mfg cost / Tonnes producedOne row per production order batch produced
A preview of what's actually built for this KPI — extracted from the real Implementation Pack, not a mockup.
This is the primary ratio the pack's other measures build on — trend, rank, and period-comparison variants, all on Fact_Production_Order_Batch.
Fact_Production_Order_Batch — 9 mandatory columns — product key, production line key, ...Dim_Material — material_key + material_descriptionDim_Plant — key + nameDim_Product — key + nameDim_Production_Line — key + nameDim_Recipe — key + nameDim_Shift — key + nameDim_Date — Auto-generated calendar table — no customer data requiredFull field-by-field data contract, in 4 SQL dialects (SQL Server, Snowflake, Databricks, BigQuery), ships in the pack.
| Target | 180 — performance considered compliant at or below this line |
| Warning | 265 — amber alert — triggers a review |
Both live in one Excel tab — change them, refresh the report, done. No DAX editing needed.
Everything you need to build Manufacturing Cost per Tonne in Power BI — dimensional model, DAX measures, SQL views, and a food-industry demo dataset.