% of units requiring rework before release
% of units requiring rework before release
Rework Rate measures a production failure after it has happened. The associated costs of wasted labor, energy, and line capacity are already sunk before the metric is calculated.
(Reworked units / Total units) x 100One row per production order batch produced
A preview of what's actually built for this KPI — extracted from the real Implementation Pack, not a mockup.
This is the primary ratio the pack's other measures build on — trend, rank, and period-comparison variants, all on Fact_Production_Order_Batch.
Fact_Production_Order_Batch — 9 mandatory columns — recipe key, shift key, ...Dim_Batch — batch_key + batch_nbrDim_Plant — key + nameDim_Product — key + nameDim_Production_Line — key + nameDim_Recipe — key + nameDim_Shift — key + nameDim_Date — Auto-generated calendar table — no customer data requiredFull field-by-field data contract, in 4 SQL dialects (SQL Server, Snowflake, Databricks, BigQuery), ships in the pack.
| Target | 0.01 — performance considered compliant at or below this line |
| Warning | 0.045 — amber alert — triggers a review |
Both live in one Excel tab — change them, refresh the report, done. No DAX editing needed.
Everything you need to build Rework Rate in Power BI — dimensional model, DAX measures, SQL views, and a food-industry demo dataset.