Average excess fill weight above target
Average excess fill weight above target
it measures the financial cost of overfilling after the product has been packed. The raw material has already been consumed and the margin lost before the KPI is calculated.
(Average fill weight - Target weight) / Target weight x 100One row per production order batch produced
A preview of what's actually built for this KPI — extracted from the real Implementation Pack, not a mockup.
This is the primary ratio the pack's other measures build on — trend, rank, and period-comparison variants, all on Fact_Production_Order_Batch.
Fact_Production_Order_Batch — 8 mandatory columns — target fill weight, confirmation date key, ...Dim_Plant — key + nameDim_Product — key + nameDim_Production_Line — key + nameDim_Recipe — key + nameDim_Shift — key + nameDim_Date — Auto-generated calendar table — no customer data requiredFull field-by-field data contract, in 4 SQL dialects (SQL Server, Snowflake, Databricks, BigQuery), ships in the pack.
| Target | 0.003 — performance considered compliant at or below this line |
| Warning | 0.015 — amber alert — triggers a review |
Both live in one Excel tab — change them, refresh the report, done. No DAX editing needed.
Everything you need to build Give-Away in Power BI — dimensional model, DAX measures, SQL views, and a food-industry demo dataset.